Category Uncategorised

Pharmaceutical Manufacturer

DACC provided a total high-level wireless upgrade within these large manufacturing facilities including both passive and active surveys and documentation.

The upgrade was complimented with a new data installation and patching requirements within the offices across both factories.

Client

Pharmaceutical Manufacturer

Location

Senlis, Montataire, France

Services

Infrastructure Upgrade

Sector

Manufacturer

Key stats

• 3500 Cat6A Outlets
• 80 Acres across 2 factories
• WiFi Upgrade
• WiFi Mapping
Live production environment
• Cabinets mounted at high level
• Secondary containment installed
• Passive and active surveys
• Testing and commissioning

top

Office

Got a project in mind?

Lump-Sum Contracting

The Construction Manager is not required to provide an estimate or contract cost breakdown and does not typically participate in pre-construction.

Design - Build

Certainty of outcome. It’s why our clients choose us for their most challenging Design/Build projects.

Pre-Construction Services

From engineering to preconstruction, we offer a variety of services and delivery methods.